Our House -- A Table of Contents
This is where you can always come to find the location of any page on this site.
Skip all the rest of the pictures and go to the most recent photos.
Go to the bottom of this page.
It all starts with The Model
Model
Directions to our house (or lot)
Map
Its time to start digging
Day 1
Day 2
Pouring the foundation
Day 1
Time to fill in with the backfill
Day 1
Day 2
Framing at a Glance
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9 (Whoops, we bought couches today and it was to dark for pictures, don't worry though, not much happened today.)
Day 10
Day 11
Day 12
Day 13 (Sorry no camera today)
Day 14
Day 15
The windows finally get put in and plumbing is started!!
Day 1
The plumbing gets started and HVAC is ready to go in
Day 1
Day 2
HVAC is going in and roofers have started
Day 1
Day 2
Day 3 (Well roofers are done and fireplace goes in today)
Concrete for steps and basement floor along with garage floor poured
Day 1
Electrical starts today, right after this will be the wiring experts installing my Catagory 5 Network Cable
Day 1
Insulation
Day 1 Sorry, Leslie and I were out of town over the last week and missed a lot of activity. You can see our wiring, both electrical
and network cabling along with whole house audio.
Brick & Drywall
Day 1 Not many good pictures today but still worth a look.
Day 2 (we actually missed day 2 but it was a Friday and we got the next day when they got a lot more done.)
Day 3 (not really but the progress appears slow due to drywall drying time).
Wood and Tile Floors
Day 1 (Actually I have not posted the wood floors because it has been a few days and I am trying to make up for it).
Day 2 (Well the tile got laid wrong the first day, so day two was just an extension of day 1 photos)
Day X (These are simply images of the significant errors on the part of the tile installers)
Stairs, Cabinets and Bathroom Wall Tile
Day 1 (As with above, I have gotten lazy with my photo's so this is several days work)
Day 2 (Well they finished stairs and almost finished tile, then they installed towel bars and TP holders even though they
were not supposed to put them in.
Lights, Landscaping and more
Day 1 (First day of pictures, thought definately not the first day of putting up the lights)
Day 2 (Lots done on Landscaping and the carpet was started today)
|